Difference between revisions of "Extended baggage"
From Bearhawk N813Z
m |
m |
||
| Line 4: | Line 4: | ||
This documented and proven modification to his Bearhawk fuselage removes the station "V" tubes at the flap cable Y station and replaces them with a dog-leg structure, which allows a large pass-through area. This makes is easier to haul long or bulky items, or even for a person to sleep in the fuselage with the rear seat removed. It necessitates moving the flap "Y" cable routing one station rearward, as well as addition of another pulley block. | This documented and proven modification to his Bearhawk fuselage removes the station "V" tubes at the flap cable Y station and replaces them with a dog-leg structure, which allows a large pass-through area. This makes is easier to haul long or bulky items, or even for a person to sleep in the fuselage with the rear seat removed. It necessitates moving the flap "Y" cable routing one station rearward, as well as addition of another pulley block. | ||
| − | The modification is [[approved]] [[File:Barrows reply.pdf]] by Bearhawk designer Bob Barrows. | + | The modification is [[approved(https://n813z.bushplanelab.com/images/6/66/Barrows_reply.pdf)]] [[File:Barrows reply.pdf]] by Bearhawk designer Bob Barrows. |
Photos from another builder | Photos from another builder | ||
Revision as of 08:32, 21 May 2024
Motivation
This documented and proven modification to his Bearhawk fuselage removes the station "V" tubes at the flap cable Y station and replaces them with a dog-leg structure, which allows a large pass-through area. This makes is easier to haul long or bulky items, or even for a person to sleep in the fuselage with the rear seat removed. It necessitates moving the flap "Y" cable routing one station rearward, as well as addition of another pulley block.
The modification is approved(https://n813z.bushplanelab.com/images/6/66/Barrows_reply.pdf) File:Barrows reply.pdf by Bearhawk designer Bob Barrows.
Photos from another builder
Tasks
- Cut out the V-tubes
- Clean up the remnants of V tubes and welds
- Build and weld in dog-leg structure
- Build new pulley bank for next station aft
- Build pulley bracket for elevator cable redirect
- Build and weld on new fairleads
- Build and weld on new flap pulley bushings
