Difference between revisions of "Extended baggage"

From Bearhawk N813Z
Jump to: navigation, search
m
m
Line 5: Line 5:
 
=== Tasks ===
 
=== Tasks ===
  
* Cut out the V-tubes
+
# Cut out the V-tubes
* Clean up the remnants of V tubes and welds
+
# Clean up the remnants of V tubes and welds
* Build and weld in dog-leg structure
+
# Build and weld in dog-leg structure
* Build new pulley bank for next station aft
+
# Build new pulley bank for next station aft
* Build pulley bracket for elevator cable redirect
+
# Build pulley bracket for elevator cable redirect
* Build and weld on new fairleads  
+
# Build and weld on new fairleads  
* Build and weld on new flap pulley bushings
+
# Build and weld on new flap pulley bushings

Revision as of 18:58, 23 August 2018

The Schubag

The "Schubag," so-named for Matthew Schumacher's modification to his Bearhawk fuselage, removes the station ___ "V" tubes and replaces them with a dog-leg structure, which allows a large pass-through area. This makes is easier to haul long or bulky items, or even for a person to sleep in the fuselage with the rear seat removed.

Tasks

  1. Cut out the V-tubes
  2. Clean up the remnants of V tubes and welds
  3. Build and weld in dog-leg structure
  4. Build new pulley bank for next station aft
  5. Build pulley bracket for elevator cable redirect
  6. Build and weld on new fairleads
  7. Build and weld on new flap pulley bushings